Lodge Improvements & Renovations

Third Floor Renovation completed in 2018:

  • Repainted the common area walls on the third floor and the stairwell to the basement
  • Repainted the bar-room walls and ceiling
  • Completely renovated the third-floor bathrooms: new tile, plumbing fixtures, lights, etc.
  • Installed hydronic radiant flooring throughout the third floor. Each bathroom and room have separate thermostats.
  • Repaired and repainted the walls and ceilings of the third-floor rooms
  • Installed new flooring throughout the third floor

Other Improvements completed in the past 18 months:

  • We replaced the old 80% efficient boiler with new 95% efficient boilers. Not only making them more cost-effective, but the new system can modulate to the correct temperature all of the time instead of cycling on (warm) and off (cold).
  • We upgraded the wireless access in the building to a modern system. The new wireless access points provide the Lodge coverage at speeds exceeding the internet service providing a better user experience.
  • Replaced the front door, rear lower-level door, and first-floor bathroom door locks with an electronic system from Brivo; This allows for better control, management, and tracking of the users, contactless unlocking, and better building security.
  • The leased washer and dryer were removed and replaced with a donated set. At the same time, the laundry room was refreshed, including installing new lighting.
Old Boiler

 

New Heating System

 

New Security System

 

Check back for future improvements.